How is M Bar C addressing current COVID-19 regulations?
Western Division: 760-744-4131 | Eastern Division: 617-399-8186

    San Diego International Airport

    Location: San Diego, CA
    System Size: 3.3 MW
    Installation Type: Solar Photovoltaic Carports

    The San Diego International Airport solar carport installation spans the parking lots of Terminal 2 West and a portion of the Terminal 2 short-term parking lot. The system generated an estimated 5.3 million kilowatt-hours of electricity in its first year of operation-enough to off-est approximately 10-13% of energy needs for Terminal 1 and 2 of San Diego International Airport.

    Back to Carport Case Studies