How is M Bar C addressing current COVID-19 regulations?
Western Division: 760-744-4131 | Eastern Division: 617-399-8186

    San Marcos Unified School District

    Location: San Marcos, CA
    System Size: 7.8 MW
    Installation Type: DSA Solar Photovoltaic Carports

    The San Marcos Unified School District DSA (Division of State Architecture) Pre-Approved Solar Carports span across 14 different San Marcos schools. Throughout the 14 sites, the district partnered with M Bar C Construction for the installation of an impressive 5.34 megawatts of DSA Solar Carports. These structures provide enough energy to power upwards of 4000 homes at once.

    Back to Carport Case Studies